exterior

27/05/2020

exterior progress update

Sundeck looking forward, paint prep continues

Port side exterior of bridge, paint prep continues

Starboard side foredeck hull pain prep continues

Masking of anchor pockets during priming

Aft deck Paint prep continues

Beach club hull opening starboard side

Port stabiliser shaft

Raw water intake for main engines, surface prep for primer

Hull opening for jet unit, ready to have metal flange face attached

Sun deck pool to be installed, paint prep continues

Starboard main deck paint priming continues

Bow paint priming continues

Removal of masking after spraying of primer

Transom door installed

Exterior of bow thruster starboard side

Starboard stabiliser shaft

Looking inside jet unit water intakes

Jet unit exterior flange face ready to be drilled and cut

Port side forward Speed Log

Port side bridge exterior looking forward, paint prep continues

Starboard side hull primer continues

Bow primed

Tender garage door installed

Transom door installed

Inside bow thruster tunnel

Jet unit nozzle primed

Jet unit water intakes primed

Jet unit exterior flange face drilled and cut for jet nozzle and pipework installation