engineering

27/05/2020

engineering progress update

Stairwell to engine room and beach-club being prepped for 1st stage carpentry

Hull opening of the port side beachclub

All three main engines installed, exhaust mufflers to be connected

 

Looking down the stairs

Combined technical plumbing manifold & fuel centrifuge

Looking over the three engines from the front end

Tender garage fit out continues

Electrical main switchboard installation continues

Wiring continues to be connected in engineroom