engineering
04 nov. 2020
engineering progress update
Anchor chain lockers
Propeller port side
Chilled water system piping installation in progress
Anchor chain locker
Dry dock manifold in place, preparation for cooling system testing
Exhaust above and below water valve installed
Propeller Starboard side
Hot water hotel system being installed
Grey water tank finished, tanks are 95% complete