Engineering
Q4 REPORT
PROGRESS UPDATE
Main Power switchboard installed in the Engine Room
Stabiliser fins are lifted into position and secured
Local Electrical power distribution panels are installed and wiring being connected
Large storage Refrigerators and Freezer units are installed at the Tank Deck level along with the furnished laundry cupboards and machines.
Stabiliser fins are lifted into position and secured
Large storage Refrigerators and Freezer units are installed at the Tank Deck level along with the furnished laundry cupboards and machines.
Main Sea Water strainer units are installed, and all plumbing connections continue in all areas.