engineering

16 june 2020

engineering progress update

Pipe & cable runs continue

Hydraulic valve block to be connected

Fire suppression system blocked by discharge column, needs relocating

Cracked screen on generator power meter, needs to be replaced

 

Fire fighting hose connection installed

Insulation on the Exhausts

Tank deck fit out continues, floor plates to go down

Screen to be installed in operational board

Pipe runs continue

Protection over the main engine, floor plates to be installed

Pipe runs continue

Air handler unit for air conditioning