engineering

15 June 2020

engineering progress update

Aluminium suspension frames for deck head mounts

Floor plate up between the main engine and generator

hydraulic and proxy switch, through hull arrangement

Metal swarf and debris in bilges, yard need to clean and rectify boat wide

 

Resilient mounts for aluminium frames

Cable runs continue

HUG exhaust system ontop of generator

Lagging insulation on chilled water system for Air conditioning

Engine to gearbox coupling

Power management systems coming online.

Damage to finished items, the yard need to rectify this issue boat wide.