engineering

02/09/2020

engineering progress update

Panelling installed, cable runs continue

cosmetic damage to pump, vessel notified, repairs to be done

Tender trolley installed in the tender garage

Drive shaft line awaits final install

 

Vessel cleanliness, yard has been notified and is working to rectify this

Winch installed in the tender garage

Water tight door principle install

Locking pin in secured position

Locking pin in secured position

Vessel cleanliness, yard has been notified and is working to rectify this

Alloy surfaces being primer protected, cable runs continue

Fire proof and insulation material installed