exterior

01 OCT. 2020

exterior progress update

Boot topping Stbd

Chain locker

Chain locker

Teak installation

Teak installation

Upper Mast Topcoat

Upper Mast Topcoat

 

Jacuzzi area

SD Mast painting

SD Mast painting

Topside fairing inspection

Topside fairing inspection

Transom door works in progress

Transom door works in progress

Transom area - 2nd stage filler with some metal primer visible

Transom area - 2nd stage filler with some metal primer visible

Main deck exterior seating

Transom Door

Transom Door

Upper Deck overhead structure

Upper Deck overhead structure

Transom door aperture

Transom door aperture