exterior
01 OCT. 2020
exterior progress update
Boot topping Stbd
Chain locker
Teak installation
Upper Mast Topcoat
Jacuzzi area
SD Mast painting
Topside fairing inspection
Transom door works in progress
Transom area - 2nd stage filler with some metal primer visible
Main deck exterior seating
Transom Door
Upper Deck overhead structure
Transom door aperture