PROGRESS Report #001 | Q2 - 2021
EXTERIOR
Fairing of the exterior hull and superstructure is well underway with the hull main deck painted in a white tell coat primer. This will allow the fairing team to see any imperfections in the fairing and correct this before going to full primer coat.
Fairing of the Upper Deck and Sun Deck have good progress as shown here in the green fairing compound colour.
INTERIOR
Crew cabin fit out is well underway having all 4 crew cabins main cabinetry installed, and the bathrooms in works.
Lower Deck Guest cabin installations have begun with the preliminary floor foundations in readiness for the main cabinetry.
Main Deck Salon and Owners Cabin have the floating floors installed and first fix cable runs underway.
Upper Deck Master Cabin and Bridge areas begin installation of the floating floor system.
ENGINEERING
All technical areas have most of the main machinery components installed. Tank Deck has the laundry equipment in place with the refrigeration components substate in works.
Main machinery Engine room now has the Main propulsion engines and electrical generator units installed, along with the Water Treatment plant, Air Conditioning plant, Fresh Water RO units, Oily water separator, and the shore power convertors.
The Gymnasium has first fix electrical cables still being run and is allowing good access to the Engine Room at present for the last of the ancillary machinery and pipework installation.
The Adventure Station / Tender garage has the stern doors installed and the Hydraulics being tested for first fitment.