INCLINATION TEST
Monday 29th June 2020 at 07.00 we commenced the inclination test with the ABS surveyor and the technical department from SanLorenzo.
As you will note from the photos (see inclination test section below), there was still some scaffolding and weight distribution that will require recalculating. We requested all tanks to be manually sounded and all fluids recorded.
The ABS surveyor obtained and recorded all the information and has advised us he has enough data to produce the report.
We have questioned the surveyor on the outcome of the sister ship inclination test which was positive.
As soon as we have the report from ABS, we will keep you advised. At this stage, there is no need for concern.
Vessel in position for inclination test
In water inspection of load line marks by ABS surveyor
Cran picking up weights for inclination test
Aft pole used to measure degree of forced listing
Crane lifting weights onboard
Image of weight used, 1 ton each
Fwd pole used to measure degree of forced listing