engineering
30 june 2020
engineering progress update
Cables runs need tidying up along with trunk lines, corrective action required and being agreed.
Excess cable to be corrected
Pipe has been adjusted, needs to be repainted
Insulation around main engine exhaust in progress.
Item cable tied around lagging, this needs to be corrected.
Clean plumbing and cable runs.
Garage door testing
Hydraulic lines cable tied together correctly
Cables and pipe runs
Cables and lines touching through support hole, chafing will occur and compromise the lines. Builder is working to provide a solution
Insulation needs to be finished, builder agrees.
Genset exhaust needs to be supported, added to construction log
Insulation jacket to be installed in due course
Hydraulic runs overhead.
Lines and cables not supported, supports required and builder is providing.
zip ties used to secure hydraulic lines
Damage sustained to the beachclub crane, need to be repainted by builder.
Lagging stops part way along a pipe, remaining part to be installed.
Broken grill on air conditioning vent, to be replaced.
Plumbing and cable runs