Progress Report #01 | Q2 2022

Hull 05 inside the fit-out shed in Viareggio, Italy:


Main Engine exhausts are laminated into the hull:


Water injection flanges on exhaust low pressure discharge:              

Bulkhead penetrations installed and pressure tested:


Galley & Stbd Crew cabin:


Port Crew cabin:


The owners’ bathroom, dressing room, and cabin subfloor are installed.

Fresh Water tank pipework and electrical cables are installed.


The forward guest cabins are still undergoing installation of plumbing for services in the bilge space below the cabin floor.


Forward VIP cabin shows the Bow Thruster tunnel laminated into the hull.