
exterior
04/11/2020
exterior progress update
Panam in the water
Pain repairs ongoing
Pool in place
Jets and drain are covered
Transom passeralle door
Deckheads to be installed
Pool seating in place
Pump system to be installed in pool
Aft deck seating, yet to be top coated
Deckheads to be installed
Sun deck aft
Pump to be installed in pool