Progress Report #05 | Q3 2023


JULY 2023


 

Turkey - Moving 598 out of the shed and onto the floating dock was a two-day process. 6th July departed Turkey for Carrara Italy


Arrival in Carrara on the 13th of July 2023

• Alongside removing equipment and setting up for weight calculations.

• 598 will be lifted and moved into SHED 4 where 596 is under construction. 

 

SUN DECK LOOKING FORWARD

SUN DECK LOOKING AFT

SUN DECK LOOKING AFT

SUN DECK LOOKING FORWARD

BRIDGE DECK CREW RELAX AREA

PORT BRIDGE DECK LOOKING FORWARD

WHEELHOUSE


BRIDGE DECK LIFT AREA

BRIDGE DECK CINEMA RELAX AREA

OWNERS DECK PORT FORWARD

BRIDGE DECK CINEMA RELAX AREA

OWNERS DECK AFT

FOREDECK

MAIN MAST


OWNERS CABIN LOOKING FORWARD

TENDER GARAGE

MAIN DECK AFT STB GUEST CABIN

MOORING DECK FORWARD

BEACH CLUB STAIRWAY

BEACH CLUB BALCONY

UPPER ENGINE ROOM


CREW CABIN STB FORWARD

LOWER ENGINE ROOM

LOWER ENGINE ROOM LOOKING AFT

LOWER ENGINE ROOM LOOKING AFT

PUMP ROOM LOOKING FORWARD


UNDER LOWER DECK STABILIZER BAY

BOW THRUSTER ROOM

TECHNICAL AREA FORWARD PORT

LAUNDRY LOOKING FORWARD

DUMB WAITER PANTRIES


AUGUST 2023


Hull & Underbelly


SUN DECK


BRIDGE DECK

 

OWNERS DECK


MAIN DECK


LOWER DECK


UNDER LOWER DECK


SEPTEMBER

No work done for the month of September.