Progress Report #03 | March 2023
Introduction
• 604 is currently in the hull and superstructure construction phase over two sites in Orhanlı and Tavasanli, Istanbul area Turkey.
• Orhanli is where the block construction phase of 604 is taking place as shown in the December report. Tavasanli has started on the erection of prefabricated blocks. The blocks will be continued to be transported to Tavasanli as they are completed.
• This report shows the current status of 604 for the month of January 2023 from both above locations with reference to the construction block drawing.
• The following shows block production taking place in Orhanlı.
• Clockwise from the front left of the drawing the following blocks are in construction numbers referenced from the below drawing.
• BT02, CI02, PC05, PC02, PC04, PC03, BT08, BT07, C107, BT03, CI03.
BLOCK PRODUCTION
BLOCK PRODUCTION PC06,BT01,PC07,PC08,PC01 & PC08
LR BLOCK ACCEPTANCE FOR CI07,BT07,BT08
CI07,BT07 LOOING IN THE FORWARD DIRECTION
BLOCK INSPECTION DID FIND SOME CONTRUCTION FAULTS TO BE RECTIFIED
ALUMINIUM SUPERSTRUCTURE BLOCK CONSTRUCTION HAS STARTED
BLOCKS IN RED ARE IN ERECTION STAGE SHOWN
BLOCK ERECTION OVERVIEW FROM AFT ON LEFT AND FORWARD ON RIGHT
TENDER GARAGE & PC03,CI03,BT03,PC04,CI04,PC05,CI05,BT06
TENDER GARAGE STARBOARD AND LOOKING AFT SHOWING SPLIT GARAGES
GUEST STAIRS TO TENDER GARAGE FROM PC04
PC05 STARBOARD AND PORT
ENGINE ROOM WALKWAY & PC05,PC04 ON TOP OF TENDER GARAGE